ARMENIA’S NPP RE-CONNECTED TO ENERGY SYSTEM AFTER MAJOR OVERHAUL
Share :
Download PDF :

19.10.2021


Public Radio of Armenia (18 October 2021)

 Siranush Ghazanchyan

 

The Armenian Nuclear Power Plant was re-connected to the energy system of Armenia over a major overhaul on Sunday.

The final preventive and maintenance work within the framework of the project to modernize and extend the life of the Armenian nuclear power plant has been completed.

Click for more




No comments yet.

Kaynaklar:

Analiz
Yorum
Blog
Rapor
Bülten